Letters

Datesort ascending Title Document Type Document
November 1, 2007 Board Announcement of a Public Meeting Regarding the Safety Posture at Los Alamos National Laboratory, Including Actions Taken in Response to the Board's Letter, Dated February 1, 2007, to the ACting Administrator of the NNSA Letter PDF iconPDF
November 1, 2007 DOE Transmittal of NNSA Integrated Safety Management Systems Descriptions, NA-1 Supplemental Directive 450.4-1, Which Fulfills Commitment 22C in the 2004-1 Implementation Plan Letter PDF iconPDF
November 1, 2007 DOE Reporting Completion of Environmental Management (EM) Portion of Commitment 22D in the 2004-1 Implementation Plan Letter PDF iconPDF
October 26, 2007 DOE Letter Regarding the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan, Revision 14 Letter PDF iconPDF
October 24, 2007 DOE Letter Regarding Commitments 2.9, 2.10, and 2.13 for the DOE's Implementation Plan for Board Recommendations 2001-1, High-Level Waste Management at the Savannah River Site Letter PDF iconPDF
October 24, 2007 DOE Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials Letter PDF iconPDF
October 23, 2007 Board Issues a Reporting Requirement for a Report and Briefing within 60 Days for a Safety Rationale and Schedule for Safe Operation of CMR Letter PDF iconPDF
October 16, 2007 DOE Letter Informing that the Central Technical Authority (CTA) for the DOE has Completed Commitment 3 in Revision 2 of the 2004-1 Implementation Plan Letter PDF iconPDF
October 15, 2007 NNSA Transfer of Responsibility at Nevada Test Site to the Management and Operations Contractor at NTS Letter PDF iconPDF
October 1, 2007 DOE Transmittal of NNSA Central Technical Autority (CTA) Guidance to the Office of the Deputy Administrator for Defense Programs Letter PDF iconPDF

Pages