December 21, 2007 |
DOE Letter Regarding NNSA's Plans for Preparing the G-Tunnel for the Limited Possibility that it will be used for Disposition of an Improvised Nuclear Device (IND) |
Letter |
PDF |
December 21, 2007 |
DOE Letter Regarding the Summary of Actions Taken and Responses to the Three Remaining Questions Regarding the Geotechnical and Seismic Investigations for the Integrated Waste Treatment Unit (IWTU) Facility Design |
Letter |
PDF |
December 21, 2007 |
DOE Letter Requesting an Additional 90-Day Extension to Provide Report Regarding Safety Rationale for Continuing the Operation of the Chemistry and Metallurgy Research (CMR) Building at LANL |
Letter |
PDF |
December 21, 2007 |
DOE Letter Requesting an Additional 60-Day Extension to Submit Report in order to Provide a More Comprehensive and Informative Description of the Status of Safety Improvements at LANL |
Letter |
PDF |
December 20, 2007 |
DOE Letter Regarding the Project Underway at the Nevada Test Site. |
Letter |
PDF |
December 17, 2007 |
DOE Letter Regarding the National Nuclear Security Administration's Utilization of the Materials Accountability and Safeguards System at the Los Alamos National Laboratory |
Letter |
PDF |
December 10, 2007 |
DOE Transmitting the Office of Environmental Management's Low Priority Facility Review Reports to Satisfy Commitment 8.6.3 in the 2004-2 Implementation Plan, Active Confinement Systems |
Letter |
PDF |
November 30, 2007 |
DOE Letter Summarizing the Results Regarding the Completion of Phase 1 and Phase 2 Assessments of the Safety Management Programs and Safety Related Structures, Systems, and Components at the Device Assembly Facility at the Nevada Test Site |
Letter |
PDF |
November 23, 2007 |
DOE Letter Regarding the Approval of National Nuclear Security Administration (NNSA) Review Plan for the Design Agency (DA) Implementations of DOE-STD-3016-2006, Hazard Analysis Reports for Nuclear Explosive Operations |
Letter |
PDF |
November 2, 2007 |
DOE Letter Reporting the Results of the Review of NNSA Site Office and Contractor Procedures and Mechanisms for using the 25 Rem Evaluation Guideline as Required under Deliverable 8.9.1 of the Implementation Plan 2004-2, Active Confinement |
Letter |
PDF |