April 29, 2008 |
Board Considers Recommendation 94-1 to have been Superceded by Recommendation 2000-1 and Closes Recommendation 94-1 |
Letter |
PDF |
April 29, 2008 |
DOE Notification to the Board that Responsibility for Nuclear Safety Research and Development has been Transferred to Dr. Kevin Greenaugh |
Letter |
PDF |
April 17, 2008 |
DOE Report on Schedule for Updating Directives Impacted by DOE Standard 1189 |
Letter |
PDF |
April 4, 2008 |
Board Accepts the Implementation Plan for Recommendation 2007-1 |
Letter |
PDF |
April 2, 2008 |
DOE Transmittal of 9212 Continued Safe Operating Oversight Team Annual Report (Y/TIS-302) and The Uranium Processing Facility Project 2007 Annual Report for the Defense Nuclear Facilities Safety Board |
Letter |
PDF |
March 28, 2008 |
DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated |
Letter |
PDF |
March 28, 2008 |
Board Closes Recommendation 98-1, Resolution of Issues Identified by DOE Internal Oversight |
Letter |
PDF |
March 25, 2008 |
DOE Response to Board's October 26, 2007 Letter, Concerning the Safety Rationale for Continuing the Operation of the Chemistry and Metallurgy Research Building at the Los Alamos National Laboratory |
Letter |
PDF |
March 20, 2008 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 60 Days Describing the Risks Associated with Each of the Dismantlement Strategies Being Considered for the B53 Weapon System |
Letter |
PDF |
March 19, 2008 |
DOE Acknowledges Receipt of the Board's Recommendation 2008-1, Safety Classification of Fire Protection Systems, issued on January 29,2008. |
Letter |
PDF |