March 24, 2004 |
DOE Information on Technical Qualifications and Experience of Personnel Involved in the Development of DOE Technical Standard on Administrative Controls Relative to Implementation Plan 2002-3 |
Letter |
PDF |
March 24, 2004 |
Board Issues a Reporting Requirement for a Report within 60 days Identifying the Critical Information Needed to Design Mixing Systems for non-Newtonian High-Level Wastes and Complete Black Cell Designs |
Letter |
PDF |
March 23, 2004 |
Board Issues a Reporting Requirement for a Report within 60 Days Addressing How DOE Will Ensure that the Proposed BNI Methodology Receives Adequate Review and Comment Through a Peer Review Process |
Letter |
PDF |
March 22, 2004 |
DOE Completion of Commitment 4.4.3 of Implementation Plan for Software Quality Assurance, Recommendation 2002-1 |
Letter |
PDF |
March 19, 2004 |
DOE Response to Board Reporting Requirement Regarding a Weapon Dismantlement at the Pantex Plant |
Letter |
PDF |
March 18, 2004 |
DOE Additional Information as a Follow-up to the Sandia National Laboratory Briefing with the Board on its New Management Team and Other Areas of Interest to the Board |
Letter |
PDF |
March 18, 2004 |
DOE Lightning Protection System at the Weapons Engineering Tritium Facility and Safety Classification of the Electrical Distribution System at the Chemistry and Metallurgy Research Facility |
Letter |
PDF |
March 18, 2004 |
DOE Report on the Analysis of the Temperform USA Investigation |
Letter |
PDF |
March 16, 2004 |
DOE Invitation to Board Chairman John Conway or a Member of the Board to be a Guest Speaker at the 2004 Facility Representatives Workshop Scheduled for May 18-20, 2004, in Las Vegas, Nevada |
Letter |
PDF |
March 9, 2004 |
DOE Additional Information as a Follow-up to the February 3, 2004 Board Public Meeting |
Letter |
PDF |