Summary of Significant Safety-Related Infrastructure Issues at Operating Defense Nuclear Facilities - Second Report |
Download |
DOE Letter Informing the Board that the DOE Will Require Until November 15, 2011, to Complete Deliverable 5.2.3 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Download |
Review of Safety Basis, Tritium Facilities, Savannah River Site |
Download |
Board Staff Trip Report Regarding Major Observations in Radiological Protection at SRS |
Download |
Report of a Trip to the Savannah River Site (SRS) Concerning Supplementary Safety System (SSS) Design Adequacy and Other Topics (File Reference - SSSRPT) |
Download |
Savannah River Site Trip Report: April 28 - May 1, 1992 |
Download |
Trip Report for Staff Visit to NTS, April 28-29, 1993 |
Download |
Board Comments on DOE Revisions to Policy Statement 450.2 |
Download |
Report on Review of F-Canyon and FB-Line Safety Envelopes - Savannah River Site |
Download |
Board Testimony at the FY 1997 Defense Authorization Hearing Regarding Health and Safety of the Public and the Workers throughout the Defense Nuclear Complex |
Download |