November 23, 2010 |
DOE Letter Responding to the Board's Letter Regarding the Inclusion of Hazard Controls within Safety Basis Documents at the SRS |
Letter |
PDF |
November 19, 2010 |
DOE Letter Regarding the NNSA Integrated Approach to Nuclear Safety Governance |
Letter |
PDF |
November 9, 2010 |
DOE Letter Elaborating the Process and Criteria Being Used to Evaluate Control Strategies for Seismically-Induced Events for the Implementation Plan for Board Recommendation 2009-2 Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
November 5, 2010 |
DOE Letter Responding to the Board's May 21, 2010 Letter Requesting an Analysis for Setting Forth a Technically Defensible Basis |
Letter |
PDF |
October 20, 2010 |
DOE Letter Requesting an Extension in Response to Board's Letter to Provide Briefings and Reports for the Critical Experiments Facility at the Nevada National Security Site |
Letter |
PDF |
October 18, 2010 |
DOE Letter Discussing Changes to the Hanford Tank Farm Documented Safety Analysis and Associated Technical Basis in Response to the Board's Letter |
Letter |
PDF |
October 13, 2010 |
DOE Letter Transmitting an Updated Implementation Plan Schedule for Recommendation 2008-1 |
Letter |
PDF |
October 12, 2010 |
DOE Letter Requesting a 30-day Extension to Provide a Complete Response to the Board's Letter Regarding the Inclusion of Hazard Controls within Safety Basis Documments at the Savannah River Site |
Letter |
PDF |
October 1, 2010 |
Board Acknowledges Correspondence Dated August 16, 2010, Regarding the Safe, Secure Storage of Uranium-233 at Oak Ridge National Laboratory and the Board's Closure of Recommendation 97-1 |
Letter |
PDF |
October 1, 2010 |
DOE Letter Transmitting the Tank Waste Subcommittee's Review of the WTP Design and Possible Improvements to Project Cost and Schedule |
Letter |
PDF |