Letters

Datesort ascending Title Document Type Document
January 24, 2012 DOE Letter Informing the Board that the DOE has Completed Action 2-1 of the Implementation Plan (IP) for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) Letter PDF iconPDF
January 19, 2012 Board Response to November 10, 2011, DOE Letter Enclosing the Implementation Plan for Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant Letter PDF iconPDF
January 12, 2012 DOE Transmittal of Board Recommendation 2010-2 Implementation Plan Deliverable 5.7.3.4 Letter PDF iconPDF
January 6, 2012 DOE Forwards December, 2011, DNFSB Recommendation 2010-1 Milestone 6.1.1 Report, "Evaluation of Improvement Areas for the DOE Safety Analysis Development Standard (DOE-STD-3009)" Letter PDF iconPDF
December 27, 2011 DOE Forwards the Report, "System for Analysis of Soil Structure Interaction (SASSI) Software Quality Assurance Practices" Letter PDF iconPDF
December 21, 2011 DOE Response to Board June 24, 2011, Reporting Requirement Outlining Actions Taken or Planned Regarding the Fire Protection Program at the Waste Isolation Pilot Plant (WIPP) Letter PDF iconPDF
December 9, 2011 DOE Response to Board October 6, 2011, Reporting Requirement, enclosing the CH2M Hill Plateau Remediation Company (CHPRC) Waste Encapsulation and Storage Facility (WESF) Corrective Action Plan (CAP) Letter PDF iconPDF
December 9, 2011 DOE Letter of Appreciation to Board and Board Staff for Contributions to the Review Process for DOE's Safety Directives Letter PDF iconPDF
December 7, 2011 Board Closes Recommendation 2001-1, High-Level Waste Management at the Savannah River Site (SRS) Letter PDF iconPDF
December 7, 2011 DOE Clarification of Issue Regarding Lawrence Livermore National Laboratory (LLNL) Building 331 (B331) Tritium Operations Documented Safety Analysis Letter PDF iconPDF

Pages