January 24, 2012 |
DOE Letter Informing the Board that the DOE has Completed Action 2-1 of the Implementation Plan (IP) for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) |
Letter |
PDF |
January 19, 2012 |
Board Response to November 10, 2011, DOE Letter Enclosing the Implementation Plan for Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant |
Letter |
PDF |
January 12, 2012 |
DOE Transmittal of Board Recommendation 2010-2 Implementation Plan Deliverable 5.7.3.4 |
Letter |
PDF |
January 6, 2012 |
DOE Forwards December, 2011, DNFSB Recommendation 2010-1 Milestone 6.1.1 Report, "Evaluation of Improvement Areas for the DOE Safety Analysis Development Standard (DOE-STD-3009)" |
Letter |
PDF |
December 27, 2011 |
DOE Forwards the Report, "System for Analysis of Soil Structure Interaction (SASSI) Software Quality Assurance Practices" |
Letter |
PDF |
December 21, 2011 |
DOE Response to Board June 24, 2011, Reporting Requirement Outlining Actions Taken or Planned Regarding the Fire Protection Program at the Waste Isolation Pilot Plant (WIPP) |
Letter |
PDF |
December 9, 2011 |
DOE Response to Board October 6, 2011, Reporting Requirement, enclosing the CH2M Hill Plateau Remediation Company (CHPRC) Waste Encapsulation and Storage Facility (WESF) Corrective Action Plan (CAP) |
Letter |
PDF |
December 9, 2011 |
DOE Letter of Appreciation to Board and Board Staff for Contributions to the Review Process for DOE's Safety Directives |
Letter |
PDF |
December 7, 2011 |
Board Closes Recommendation 2001-1, High-Level Waste Management at the Savannah River Site (SRS) |
Letter |
PDF |
December 7, 2011 |
DOE Clarification of Issue Regarding Lawrence Livermore National Laboratory (LLNL) Building 331 (B331) Tritium Operations Documented Safety Analysis |
Letter |
PDF |