July 31, 2012 |
DOE Requires an Additional 60 Days beyond the Requested 60-Day Time Frame to Complete the DOE Response to Board June 11, 2012, Letter Regarding the Transuranic Waste Treatment Facility (TWF) Project at the Los Alamos National Laboratory (LANL) |
Letter |
PDF |
July 31, 2012 |
Board Letter to DOE Richland Operations Office Concerning the Hanford Sludge Treatment Project (STP) Preliminary Design |
Letter |
PDF |
July 31, 2012 |
DOE Letter Informing the Board that the DOE has Completed Actions 1-5, 2-2, and 2-4 of the Implementation Plan (IP) for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) |
Letter |
PDF |
July 27, 2012 |
DOE Response to Board April 3, 2012, Letter Concerning the Approach to be Used to Resolve Issues with the Waste Treatment and Immobilization Plant (WTP) Project's Application of the FLUENT Computational Model |
Letter |
PDF |
July 19, 2012 |
DOE Letter Providing DOE Path Forward on Adequate Protection |
Letter |
PDF |
July 18, 2012 |
Board Issues a Reporting Requirement Concerning Seismic/Structural Analysis at the Plutonium Facility, Los Alamos National Laboratory |
Letter |
PDF |
July 17, 2012 |
DOE Transmittal of Deliverable 5.7.3.2 of the Implementation Plan for Board Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant (WTP) |
Letter |
PDF |
July 17, 2012 |
DOE Transmittal of Deliverable 5.3.3.1 and Cancellation of Deliverables 5.3.3.2 and 5.3.3.3 of the Implementation Plan for Board Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant (WTP) |
Letter |
PDF |
July 16, 2012 |
DOE Response to Board April 18, 2012, Letter Concerning Quality Assurance at the Annular Core Research Reactor (ACRR) at Sandia National Laboratories (SNL) |
Letter |
PDF |
July 13, 2012 |
DOE Response to Board June 18, 2012, Letter Concerning the Plutonium Facility at the Los Alamos National Laboratory (LANL) |
Letter |
PDF |