January 31, 2013 |
DOE Transmittal of Implementation Plan (IP) Deliverable 3-1 for Board Recommendation 2012-1, Savannah River Site Building 235-F Safety |
Letter |
PDF |
January 16, 2013 |
DOE Response to Board November 19, 2012, Letter Concerning the Upgrade to the Nuclear Facility Safety Basis for Area G at Los Alamos National Laboratory |
Letter |
PDF |
January 16, 2013 |
DOE Requires an Extension beyond the January 31, 2013, Due Date to Meet the Annual Reporting Requirement for Closure of Recommendation 97-2 |
Letter |
PDF |
January 16, 2013 |
Supplemental and Final Response to Questions Taken for the Record |
Letter |
PDF |
January 8, 2013 |
Letter for the record |
Letter |
PDF |
January 7, 2013 |
DOE Acknowledges Receipt of and Accepts Board Recommendation 2012-2, Hanford Tank Farms Flammable Gas Safety Strategy |
Letter |
PDF |
January 3, 2013 |
Board Issues a Reporting Requirement that Provides the DOE Senior Leadership Assessment of the Current State of Public and Worker Protection for PF-4 Seismic Accident Scenarios at the Plutonium Facility (PF-4) at the Los Alamos National Laboratory (LANL) |
Letter |
PDF |
January 3, 2013 |
DOE’s Latest Revision of the Technical Work Plan and Project Plan for the System for Analysis of Soil-Structure Interaction (SASSI) Computer Code |
Letter |
PDF |
January 3, 2013 |
Storage Conditions of Reactive Metal Fuel in L-Basin at the Savannah River Site |
Letter |
PDF |
December 31, 2012 |
DOE Transmittal of Deliverable 5.5.3.1 of the Implementation Plan for Board Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant (WTP) |
Letter |
PDF |