November 5, 1996 |
DOE Response to Board's Visit to HB-Line at Savannah River Site |
Letter |
PDF |
November 4, 1996 |
DOE Quarterly Report (for the Period July 1 - September 30, 1996) for the 93-5 Implementation Plan |
Letter |
PDF |
November 1, 1996 |
DOE Quarterly Report (for the Period July 1 - September 30, 1996) for the 94-2 Implementation Plan |
Letter |
PDF |
November 1, 1996 |
Board Comments on the Safety of Planned Conduct of Experiments PFT-1 and PVT-2 at the Savannah River Site |
Letter |
PDF |
October 31, 1996 |
DOE FY 1996 Fourth Quarter Report, Revision 1 (for the Period July 1 - September 30, 1996) for the 92-4 Implementation Plan |
Letter |
PDF |
October 31, 1996 |
DOE Reporting Approval of Safety Assessment for Saltwell Pumping in Flammable Gas Tanks, Milestone 5.4.3.5.e for the 93-5 Implementation Plan |
Letter |
PDF |
October 31, 1996 |
DOE Task Initiative VI.B.4.b.2 Deliverable, " Interim Format and Content Guide and Standard Review Plan for U.S. DOE Low-Level Waste Disposal Facility Performance Assessments" |
Letter |
PDF |
October 31, 1996 |
DOE Task Initiative VI.B.4.b.2 Deliverable, "Interim Format and Content Guide and Standard Review Plan for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments" for the 94-2 Implementation Plan |
Letter |
PDF |
October 30, 1996 |
DOE Confirms Completion of Commitment 5.4.3.6a for the 93-5 Implementation Plan |
Letter |
PDF |
October 30, 1996 |
Board Comments on the Review of the DOE's Pu Ventilation System Study |
Letter |
PDF |