April 24, 2006 |
Board Issues a Reporting Requirement to DOE for a Response within 30 Days on Comments on DOE's Draft Repackaging Prioritization Methodology for Recommendation 2005-1 |
Letter |
PDF |
April 10, 2006 |
DOE National Nuclear Security Administration has Approved the Enclosed Los Alamos Site Office Functions, Responsibilities, and Authorities Manual of March 2006 |
Letter |
PDF |
April 4, 2006 |
DOE Plan for Returning the Savannah River Site's Tank 48 to Active Waste Service and a Technical Report on the Proposed Allowable Organic Residuals in the Tank |
Letter |
PDF |
April 4, 2006 |
DOE Plan for Returning the Savannah River Site's Tank 48 to Active Waste Service and a Technical Report on the Proposed Allowable Organic Residuals in the Tank |
Letter |
PDF |
March 30, 2006 |
DOE Copy of Draft DOE Manual M44I.I, Nuclear Material Packaging Manual, is Forwarded for Review and Comment |
Letter |
PDF |
March 30, 2006 |
DOE Deliverable for the Issuance of a Repacking Risk Methodology in Commitment 5.3-2 in the 2005-1 Implementation Plan, Nuclear Material Packing |
Letter |
PDF |
March 29, 2006 |
DOE Change Notice No. 3 to DOE-STD-3009, Preparation Guide for U.S. DOE Nonreactor Nuclear Facility Documented Safety Analyses, Completing Deliverable 4.2.2 and Commitment 4.2 in the 2002-3 Implementation Plan |
Letter |
PDF |
March 29, 2006 |
DOE Completion of Environmental Management's Portion of Commitment 10B in the 2004-1 Implementation Plan, Oversight of Complex, High-Hazard Nuclear Operations, which Requires EM to Develop Quality Assurance Plans |
Letter |
PDF |
March 28, 2006 |
Plutonium Production at the Idaho National Laboratory Advanced Test Reactor |
Letter |
PDF |
March 27, 2006 |
Board Issues a Reporting Requirement to DOE for a List of Vital Safety Systems at Each Site and Qualifications of Safety Personnel |
Letter |
PDF |