August 10, 2009 Expressing concern about a Chairman nominee to replace Dr. A.J. Eggenberger with demonstrated competence and knowledge relevant to the independent investigative and oversight functions of the Board Letter PDF iconPDF
July 29, 2009 Current Status of the Board's Concerns on Action Plans to Improve Both Federal and Contractor Handling of SNL-NM Safety Bases Letter PDF iconPDF
July 29, 2009 DOE Report on Actions to be Taken to Complete Recommendation 2004-2 Deliverables and Remediate Deviations from DOE's Ventilation System Evaluation Guidance Letter PDF iconPDF
July 28, 2009 Deficiencies in the Vault Water Bath System at Los Alamos National Laboratory Letter PDF iconPDF
July 28, 2009 Board Issues a Reporting Requirement for a Briefing in October, 2009, on Modification or Upgrades Planned for the Fire Suppression System to Provide Safety-Related Function at the Device Assembly Facility, Nevada Test Site Letter PDF iconPDF
July 28, 2009 Urgent concerns about the safety-class vault water bath system and HS-Pu containerization at LANL Letter PDF iconPDF
July 28, 2009 Request for briefing by NNSA regarding modifications or upgrades to fire suppression systems in the Device Assembly Facility (DAF) at the Nevada Test Site Letter PDF iconPDF
July 27, 2009 DOE Response to February 6, 2009 Board Letter Regarding Electrical Safety Issues in H-Area of Savannah River Site Letter PDF iconPDF
July 10, 2009 Finding 3 Under the Certification Mandate Provided in Section 3112 of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009, Board Staff has Reviewed Design Data for the Los Alamos CMRR Project Letter PDF iconPDF
July 9, 2009 DOE Response to Board Letter Dated March 5, 2009, Regarding the Savannah River Tank 48 Treatment Project Letter PDF iconPDF